Groundwater monitoring wells

Givot Olam drilled two groundwater monitoring wells, in the west section of the Meged field core area, in coordination with the Water Authority. The first monitoring well was drilled in 2013, prior to drilling at Meged 6. The second well was drilled in 2014 following the completion of drilling of Meged 6 and prior to […]

Meged 6 site

The Meged 6 well, located one kilometer south of Meged 5, was drilled in 2013 to a total depth of 4754 m. During the test productionwhich had started in August 2016 and had ended in December 2016, Meged 6 wellproduced appx 45,000 barrels as well as produced water. Based on the informationreceived during the tests, […]

Meged 8 site

באתר מגד 8, הממוקם מספר קילומטרים מערבית לבאר מגד 5, יתבצע קידוח הנפט הבא של גבעות עולם. התשתיות לביצוע הפעילות באתר נפרשו, כמו גם מגדל הקידוח ומתקניו ונמצאים מוכנים לפעולה. הפעילות באתר צפויה להתחיל לאחר סיום מבחני ההפקה במגד 6. Previous Next Back to all Projects

Meged 5 site

The Meged 5 well, located in the South-Eastern portion of the Rosh Ha’Ayin Lease I/11was drilled in 2009 to a depth of 4700m. With the completion of drilling, the well was stimulated to enhance deliverability of the hydrocarbons from the reservoir via natural fractures. Meged 5 well draws from a hydrocarbon bearing reservoir composed of […]

Skip to content