Givot Olam drilled two groundwater monitoring wells, in the west section of the Meged field core area, in coordination with the Water Authority.
The first monitoring well was drilled in 2013, prior to drilling at Meged 6. The second well was drilled in 2014 following the completion of drilling of Meged 6 and prior to production tests.
Previous slide
Next slide