Activities

  • Meged 5 site

    Meged 5 has been producing commercial quantities of oil since June 2011. It is currently on long-term testing.
  • Meged 6 site

    Meged 6 drilling was completed in 2014 and preparations are underway to convert to a test production site.
  • Meged 8 site

    Meged 8 is the planned site for the next drilling activities. The site infrastructure is prepared and the rig is on site.
  • Groundwater monitoring wells

    Givot Olam Partnership drilled two groundwater monitoring wells, at the base of the upper and lower Yarkon-Taninim sub-aquifer, to assure continued protection of the groundwater.